Vaisala RS92-SGP Manual do Utilizador Página 21

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 58
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 20
Chapter 3 ________________________________________________________________ Operation
VAISALA_______________________________________________________________________ 19
0705-021
Figure 7 Removing the Balloon from the Gas Nozzle
6. Fold the neck of the balloon over and secure it firmly. Tie the string
high enough to ensure that the unwinder fits easily.
0705-022
Figure 8 Folding the Neck of the Balloon
7. Leave the balloon waiting in the balloon-filling shed while you
prepare the radiosonde. Make sure the balloon does not touch
anything. Hold the balloon by the neck.
Vista de página 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 57 58

Comentários a estes Manuais

Sem comentários